2025 · Autumn · Connecticut

The Saville Dam & Barkhamsted Reservoir, Litchfield County, Connecticut In October 2025

πŸƒπŸ‚πŸπŸƒπŸ‚πŸπŸƒπŸ‚πŸπŸƒπŸ‚πŸπŸƒπŸ‚πŸπŸƒπŸ‚πŸπŸƒπŸ‚πŸπŸƒπŸ‚πŸπŸƒπŸ‚πŸπŸƒπŸ‚πŸπŸƒπŸ‚πŸπŸƒπŸ‚πŸ

The dam is named after Caleb Saville, chief engineer of the ambitious project. Foundations for both the dam and the diversion tunnel were laid in August 1934. Then, the eastern branch of the Farmington River was diverted into a concrete conduit at the bottom of the dam site. Although the Saville Dam was completed in 1940, it was not until 1948 that the Barkhamsted Reservoir filled to full capacity.Β 

πŸƒπŸ‚πŸπŸƒπŸ‚πŸπŸƒπŸ‚πŸπŸƒπŸ‚πŸπŸƒπŸ‚πŸπŸƒπŸ‚πŸπŸƒπŸ‚πŸπŸƒπŸ‚πŸπŸƒπŸ‚πŸπŸƒπŸ‚πŸπŸƒπŸ‚πŸπŸƒπŸ‚πŸ

2025 · Autumn · Our Yard

Our Yard In Late September (1)

πŸŒ³πŸƒπŸŒ²πŸπŸŒ³πŸƒπŸŒ²πŸπŸŒ³πŸƒπŸŒ²πŸπŸŒ³πŸƒπŸŒ²πŸπŸŒ³πŸƒπŸŒ²πŸπŸŒ³πŸƒπŸŒ²πŸπŸŒ³πŸƒπŸŒ²πŸπŸŒ³πŸƒπŸŒ²πŸπŸŒ³πŸƒπŸŒ²πŸ

Autumn In Our Yard

πŸŒ³πŸƒπŸŒ²πŸπŸŒ³πŸƒπŸŒ²πŸπŸŒ³πŸƒπŸŒ²πŸπŸŒ³πŸƒπŸŒ²πŸπŸŒ³πŸƒπŸŒ²πŸπŸŒ³πŸƒπŸŒ²πŸπŸŒ³πŸƒπŸŒ²πŸπŸŒ³πŸƒπŸŒ²πŸπŸŒ³πŸƒπŸŒ²πŸ

2025 · Autumn · Our Yard

First Signs of Autumn 2025

πŸƒπŸ‚πŸπŸƒπŸ‚πŸπŸƒπŸ‚πŸπŸƒπŸ‚πŸπŸƒπŸ‚πŸπŸƒπŸ‚πŸπŸƒπŸ‚πŸπŸƒπŸ‚πŸπŸƒπŸ‚πŸπŸƒπŸ‚πŸπŸƒπŸ‚πŸπŸƒπŸ‚πŸ

It’s mid-August. And it’s beginning to look a bit like Autumn in our yard. Our Birch tree and the Virginia Creeper are always the first to show themselves in crimson and gold dresses. But as we all know, Summer is not over. The days are still warm, while the nights are cooling down enough to open the windows.

πŸƒπŸ‚πŸπŸƒπŸ‚πŸπŸƒπŸ‚πŸπŸƒπŸ‚πŸπŸƒπŸ‚πŸπŸƒπŸ‚πŸπŸƒπŸ‚πŸπŸƒπŸ‚πŸπŸƒπŸ‚πŸπŸƒπŸ‚πŸπŸƒπŸ‚πŸπŸƒπŸ‚πŸ