Since Kevin’s homemade Christmas tree got positive feedback, he installed it again in 2008. The same year, I decorated a Christmas wreath for our girls.
Kevin worked on the cauldron in previous years. But it came out the best on Halloween 2009. He had to cut a hole in the bottom to fit a pipe for the fog maker. A purple light bulb was installed before he aligned the inner cauldron with some dark fabric. Kevin glued some eyeballs and bones on top of the fabric to make them look like the witch just tossed them for her brew in the cauldron. Of course, needed a stand and a “fire”. Kevin got some golfball-sized styrofoam balls, cut a small hole, and spray-painted them, so they would look like charcoal. Then he pushed red string lights in the precut holes to make the “charcoal look like it was glowing in the fire. Once the stand and the “charcoal” were in place, he set the cauldron on top of it and let the fog machine do its job. Ta-da! The witch had some brew cooking.
Kevin had a couple of motors he wanted to use for something neat on Halloween. He decided to make moving cat eyes. A couple of tiki candle holders, styrofoam balls, and spray paint needed to be purchased. The strings, wooden picks, black foam sheets, and velvet fabric we had lying around the house. Kevin also installed some mini light bulbs inside the eyeballs. So, they were glowing while they moved and stared at everyone.
This Labor Day weather is so beautiful that Kevin used the opportunity to work on his shed a bit more. Kevin ran a little short of shingles this weekend. We’ve got some more, while it was raining yesterday. The shed roof is almost done. Soon, he can begin with the interior shelving. While he works on that, I can caulk and paint the shed. It’s something I can do while he’s at work. Everything looks great so far. It’s not perfect. However, it is sufficient for storage without needing to worry about critters or a storage tent collapsing due to a major storm. It turned out to be a cute building tucked away across the house.
◊◊◊◊◊
Except for the doors, Kevin’s part of the project is done.
YEEHAW! The assembling of the shed is DONE! Once it’s caulked and painted, Kevin will finish the framework of the doors. But I want to paint the doors first before that happens. Yeah, the lawnmower and the snowblower are out of the garage. My tubs with the seasonal decorations found some space in the shed, too. Once we are done unpacking all our household goods, we can park two vehicles in the garage. The shed was so needed.
◊◊◊◊◊
The garden shed is one of the best investments and is worth every penny we spent on our new property. My seasonal decorations fit perfectly along one side of the shed wall. The camping gear is on the top shelf under the roof. Kevin’s tools can be stored in there. And our lawn/snow equipment fits perfectly on the shed floor. Everything is in its place and looks needed. Therefore, the garage doesn’t look cluttered. We can finally oversee our stuff. And don’t need to look around in every box to find it. It makes life easier, not harder.
All the roof panels are up. The roof’s front is shingled. For the rest, we have to wait until “Fred” passes through New England. If that’s even the case. Currently, meteorologists are making their predictions about the potential path of the tropical storm. Nothing is set in stone.
◊◊◊◊◊
Kevin shingled the roof some more. It surprisingly made it through Tropical Depression “Ida”. The shed stayed inside. He also installed the windows and the door. Kevin noticed that the asphalt on our driveway was too high when the door was in place. Therefore, he couldn’t open the left door all the way. He had to cut about an inch and a half off the bottom to make it fit. Once there is a trim on it, the cut will barely be recognizable. Let’s hope he gets the shed done this weekend, latest by next weekend. We need some room back in the garage.
Kevin got all four walls up. And he is ready to install the roof soon. It already looks like a building. If I didn’t know better, I’d say. The chipmunks were calculating how many acorns could fit in that shed. They keep checking it out when we are “not looking”. I wouldn’t be surprised to find a whole family in there when Winter is over and Spring arrives next year.
◊◊◊◊◊
With some help from our next-door neighbor, Kevin got more work done on the shed. Now, the roof sidings, the roof, and the vent frames are up. Because of the heat wave and the night breaking in sooner, Kevin couldn’t get as much done as he wanted to finish this week. But he installed more framework and got the lawn mowed before the relieving rain and the cooler front came in this afternoon. We are supposed to get temperatures in the upper 50s (about 14 – 15℃) tonight. It’s time to air out the house and eliminate this mugginess.
◊◊◊◊◊
Since it was much cooler, Kevin installed almost all the roof panels and some of the waterproof shields nailed to the roof. He could also put some of the pieces in the shed, so Katelynn can park on the driveway again. Now that the shed starts to look more like a building, I can’t wait to see it finished. I have that feeling, it might be constructed before the original arrival date. The shed is supposed to be delivered by the end of August. Yeah, I think Kevin gets it done before that.
Our garden shed arrived yesterday, one month earlier than we originally anticipated. It is supposed to arrive at the end of August. So, the plans for getting the master bathroom done have to wait for now. And since the weather was perfect. Kevin used this weekend to start assembling the shed. He made sure he had all the pieces and tools he needed for the building. Yesterday, he worked on the base frame. Today, he leveled and built the floor before he assembled the front entrance frame. After six hours working on the shed, Kevin had enough and needed some rest. His ankle is swollen and on ice, again. But he got something accomplished. It might go slow, but it will go steady. If he works on it for an hour or two every day (weather permitting), he will get it done in no time.
◊◊◊◊◊
The last few evenings, Kevin always worked on his project for about an hour. Monday and Tuesday, he could finish the front wall. That took the longest, because of the window and door spaces. So, he needed to make sure, the studs were exactly lined up with the siding. This evening, he worked on the back wall. The frame and the siding were done in no time. Tonight and tomorrow, it is supposed to rain. We have to wait until things have dried up a little bit.
◊◊◊◊◊
Two of the shed walls are up.
Kevin finished all the wall frames and installed two of them, today. The other two should be up in no time. Then the tricky part will be the roof frame. He’s getting there. One nail hammered in at the time. As of right now, the half-finished shed reminds me of the back walls of an oversized diorama box, my kids used to bring to school.