The dam is named after Caleb Saville, chief engineer of the ambitious project. Foundations for both the dam and the diversion tunnel were laid in August 1934. Then, the eastern branch of the Farmington River was diverted into a concrete conduit at the bottom of the dam site. Although the Saville Dam was completed in 1940, it was not until 1948 that the Barkhamsted Reservoir filled to full capacity.Β 