Our garden shed arrived yesterday, one month earlier than we originally anticipated. It is supposed to arrive at the end of August. So, the plans for getting the master bathroom done have to wait for now. And since the weather was perfect. Kevin used this weekend to start assembling the shed. He made sure he had all the pieces and tools he needed for the building. Yesterday, he worked on the base frame. Today, he leveled and built the floor before he assembled the front entrance frame. After six hours working on the shed, Kevin had enough and needed some rest. His ankle is swollen and on ice, again. But he got something accomplished. It might go slow, but it will go steady. If he works on it for an hour or two every day (weather permitting), he will get it done in no time.

◊◊◊◊◊

The last few evenings, Kevin always worked on his project for about an hour. Monday and Tuesday, he could finish the front wall. That took the longest, because of the window and door spaces. So, he needed to make sure, the studs were exactly lined up with the siding. This evening, he worked on the back wall. The frame and the siding were done in no time. Tonight and tomorrow, it is supposed to rain. We have to wait until things have dried up a little bit.

◊◊◊◊◊

Two of the shed walls are up.

Kevin finished all the wall frames and installed two of them, today. The other two should be up in no time. Then the tricky part will be the roof frame. He’s getting there. One nail hammered in at the time. As of right now, the half-finished shed reminds me of the back walls of an oversized diorama box, my kids used to bring to school.

… to be continued …

(08/01/2021, 08/04/2021, 08/07/2021)